You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Véronique OrsetVO

Véronique Orset

AMO Transport Infrastructure Projects

€750/day
Lyon, FR
15+ years

Average response time: 24 hours

Freelancer profile translated to English.
Back to original language

About Véronique

My extensive multidisciplinary experience in project ownership and owner's representation for various large infrastructure projects at all stages of an operation allows me to be very comfortable managing complex, multi-technical operations or projects and coordinating all involved stakeholders.
Types of projects: roads, highways, VRD (urban roads and networks), railways, bus lanes.
My website:
I will support and advise you at every stage of an operation:

- For program definition, study scope definition, drafting of design contracts, analysis of key issues and risks;

- For external controls of the compliance of study files at each stage of the MOP law: EP, DDP, AVP, PRO, DCE phases

- For global operational planning, conducting consultation meetings, anticipating procedures and supporting the project owner with state services, etc.

- For assistance in defining an operational program based on development and maintenance constraints, based on objectives, deadlines and budget, based on context and related projects;

- For anticipating the input data needs at each project phase to list the necessary additional investigations;

- For drafting tender documents for the various project stakeholders: contracts related to additional investigations, design contracts, testing and expertise contracts, CSPS contracts...

- For the analysis of applications and bids, drafting bid analysis files, and then assisting with contract monitoring;

- For the control and critical analysis of operational budgets;

- For assistance with English communication in the infrastructure sector;

- For the analysis of claims during the design and construction phases;
  • French

    Native or bilingual

  • English

    Native or bilingual

Can work on-site
Lyon (up to 50km), Annecy (up to 10km), Albertville (up to 10km), Grenoble (up to 10km), Paris (up to 10km)

Experience

  • WSP
    Director of Infrastructure and Mobility Projects
    TRANSPORTATION
    September 2019 - March 2025 (5 years and 6 months)
    Lyon, France
    Business development for the infrastructure division. Key successes: Introduction of WSP to ATMB and SANEF + 3 major design contracts (31 km RCEA, 8km widening on A4 and Rondeau Interchange in Grenoble).
    Project management for over 15 urban, road, and highway development projects in design and construction phases: budget management and contractual negotiations, planning, coordination and supervision of studies, construction monitoring.
    • Management of design contracts (MOE) for urban projects in Isère.
    • Construction supervision for 1.5 years on the multimodal hub (PEM) construction site in La Batie, public procurement management. May 2023 Client SMMAG.
    • Numerous upstream studies for highways, roads, and multimodal hubs, bus lanes, and carpooling on highways for ATMB, Sanef, Cofiroute, CD74, CD38, etc.
    • Director of major project design missions and numerous multimodal transport studies.
    Design File Control Cost Control Construction Design Management Road and Highway Project Manager Multidisciplinary Bid Preparation
  • SYSTRA
    Director of Studies for International Projects
    ARCHITECTURE AND URBAN PLANNING
    May 2017 - August 2019 (2 years and 3 months)
    Lyon, France
    Coordination of studies and partners, control, assembly, and drafting of study files in English, short missions abroad for presenting studies to clients.
    • 2 BRT (Bus Rapid Transit) projects in Saudi Arabia of 16 and 22 km. Travel to Medina. Operational English.
    • HS2 High-Speed Line in England: Control and coordination of road/HS2 interfaces on the northern section of 82 km. Client: Balfour-Beatty / Vinci. BIM context.
    Technical Project Management Planning International Study Coordination for Bus Lane Projects Drafting and Assembly of Bus Lane Study Files in English Railway and Bus Lane Project Manager
  • SYSTRA
    Manager of the Highway Development Department
    TRANSPORTATION
    January 2014 - April 2017 (3 years and 3 months)
    Lyon, France
    • Hierarchical management of 3 people
    • Leadership to position Systra in the highway market
    • Manager of complex highway bids, public procurement management;
    • Director of Studies / Deputy Project Director for A13 widening (22 km section, €140 million in works). AVP, PRO, DCE, VISA phases.
    Business Development Multidisciplinary Bid Preparation Multidisciplinary Team Management Drafting, Control, and Assembly of Highway Study Files Highway Project Manager

Recommendations

Be the first to recommend Véronique

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Engineering Diploma
    1993
    Diplôme d'Ingénieur
  • Civil Engineering
    University of Wales
    Génie Civil et

Skill set

Categories

  • Other