You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Ulrich M.UM

Ulrich M.

Mechanical Design Engineer

€610/day
Lyon, FR
8-15 years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Ulrich

Passionate about mechanical engineering and general installation, I have forged my career in the design studies and implementation of complex industrial facilities in both the nuclear and oil & gas industries.
Delivering services in compliance with current requirements, specifications, and standards is my priority commitment and essential for customer satisfaction.
Familiar with engineering and IT tools as well as project management, I am passionate about new challenges and new responsibilities.

  • French

    Native or bilingual

  • English

    Fluent

  • Spanish

    Conversational

Can work on-site
Lyon (up to 50km), Saint-Étienne (up to 10km), Marseille (up to 10km)

Experience

  • bilfinger
    General Installation Engineer
    MECHANICAL ENGINEERING
    February 2025 - October 2025 (8 months)
    Lyon, France
    Project: EPR2 on behalf of Edvance (EDF)
    Mission Objective: General Installation Engineer for the design studies of new EPR2 nuclear power plants
    Technical Environment: Mechanical, piping, process
    - Managed a team of 4 Piping designers within the design office
    - Received and processed input data related to the implementation of P&ID diagrams in a 3D model
    - Assigned tasks and managed resources/planning
    - Managed task execution and technical clarifications
    - Verified and validated completed tasks
    - Participated in project steering meetings
    - Coordinated activities with project stakeholders and disciplines (Civil Engineering, Electrical, HVAC...)
  • AptiSkills
    Technical Coordinator
    MECHANICAL ENGINEERING
    October 2023 - February 2025 (1 year and 4 months)
    Vénissieux, France
    Project: HPC (Hinkley Point C Nuclear Power Plant in the UK)
    Mission Objective: Technical Coordinator for execution studies - Piping on behalf of Bilfinger
    Technical Environment: Piping
    Achievements:
    - Received and analyzed input data for piping assembly areas to be launched
    - Prepared and launched the production of isometric drawings
    - Monitored the production of isometric drawings
    - Coordinated activities with all project stakeholders on production progress and presentation of technical points.
    - Coordinated and identified the impacts of new modifications, managed and implemented Open Points,
    - Participated in the development of strategies for integrating new modifications.
    - Launched and delivered each assembly area and associated deliverables.
    - Delivered drawings, client validation, and transferred to workshops for manufacturing
    Navisworks Microsoft Office PDMS
  • ABMI Groupe
    Mechanical Installation Design Engineer
    December 2019 - Today (6 years and 6 months)
    Tours, France
    Service for EDF (CNEPE) on various activities: POST FUKUSHIMA - Technical support for the SEU (Ultimate Water Source) project:
    • Document surveillance of deliverables produced by Contract Holders (welding books, isometrics, installation plans, flexibility calculation notes, supports and anchors, hydraulic tests...);
    • Drafting and technical review of contract specifications;
    • Technical project management and monitoring with Contract Holders and EDF. DP2D BRENNILIS Project – Support for the Preliminary Design study on the layout of areas for equipment and machinery installation:
    • Identification and listing of geotechnical tests carried out (penetration tests, load-bearing capacity tests...);
    • Identification of existing networks: electrical and hydraulic;
    • Drafting of the Contract Specification;
    EPR Project (With SPIE NUCLEAIRE) – Response to EDF's call for tenders for the realization of the backup generator sets for the EPR project
    • Drafting of technical documents (technical specifications for the procurement of pipes, fittings, supports...) as well as technical specifications relating to prefabrication/assembly, welding, and hydraulic tests;
    • Equipment dimensioning (pumps, piping, P&ID diagrams, isometrics, plans...);
    • Technical project management and monitoring with suppliers. SAP Project – National modification for the reliability of compressed air in the machine rooms of nuclear power plants:
    • Site surveys and measurements, creation of installation plans, isometrics, supports, and civil engineering, selection and dimensioning of equipment: compressors, dryers, and measurement and control instruments
    • Drafting of DOC V1 describing the chosen solution for each stage and drafting of impact analysis sheets.
    THE Project – Renovation of High Energy piping in SDM of the Chinon, Cruas, and Golfech Nuclear Power Plants:

Recommendations

Be the first to recommend Ulrich

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Engineering Degree
    CESI Engineering School
    2018
    Diplôme d'ingénieur
  • DUT
    University Institute of Technology
    2015
    DUT

Skill set

Categories