You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Reda BenjellounRB

Reda Benjelloun

Project Manager: Industrialization Methods

€500/day
Strasbourg, FR
15+ years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Reda

Project Manager for Industrialization Methods with 15 years of experience in the automotive, railway, and other industries. My expertise lies in optimizing production processes, project management, and continuous improvement, where I strive to provide innovative and effective solutions.
  • French

    Native or bilingual

  • English

    Conversational

  • Arabic

    Fluent

Can work on-site
Strasbourg (up to 50km)

Experience

  • ALTEN
    Senior Consultant
    September 2022 - Today (3 years and 9 months)
    Strasbourg, France
    • Project and continuous improvement engineer at Carambar&co in Strasbourg
    • Study of the production line transfer project for chocolate bars
    • Performance improvement of the TERRY’S line
    • Industrial means project manager for new projects at CAF Reichshoffen
    • Definition of needs and establishment of specifications
    • Supplier consultation
    • Organization of technical meetings and business award realization
    • Production transfer and Master Data “SAP” Project Manager at Hager Controls Saverne
    • Define the transfer strategy “safety stock”
    • Calculate workshop capacity load
    • Lead action plans
    • Share/report information with the project team
    • Ensure production restart
  • SNCF
    Methods Engineer
    TRANSPORTATION
    February 2018 - September 2022 (4 years and 7 months)
    Bischheim, France
    Mission:
    • Industrialization of the new ERTMS project for electrical cabin cabinets
    • Participation in writing equipment specifications (automated painting booth, surface preparation)
    • Definition of objectives per production unit
    • Site observation and modification of technical data
    • Make or buy of parts
    • Site layout according to the new master plan


    Realization:
    • Reduction of waste, optimization of cycle times
    • Analysis of different flows using the VSM method for the new factory layout
    • Calculation of the profitability of purchased parts compared to treatment cost
    Result:
    • 7% productivity
    • Optimization of flows between different workstations
  • NOVARES (Mecaplast)
    MEL (Manufacturing Engineering Leader)
    AUTOMOBILE
    May 2017 - January 2018 (8 months)
    Monaco, Monaco
    Automotive plastic equipment supplier

    Mission:
    • Industrialization of new projects
    • Creation of process documents
    • Optimization of the number of operators and production area

    Realization:
    • Successful client process validation audit
    • Improvement of assembly stations.
    • Optimization of storage space.

Recommendations

Be the first to recommend Reda

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Sciences
    (Louis University
    Sciences

Skill set

Categories