About Mickael
French
Native or bilingual
English
Fluent
Experience
- OLYS EngineeringHead of Engineering Hub (Stress Analysis)ENERGY AND UTILITIESJanuary 2023 - June 2023 (5 months)Marseille, FranceSale of EFINOR Engineering IDF to FRAMATOME via OLYS Engineering.Assisted FRAMATOME on a project.Project involved verifying existing installations (piping networks, Pressure Equipment, supports) by applying the latest standards in force following Post-Fukushima.In parallel, fixed-price projects such as: dimensioning of an extension structure on either side of a Monorail, new anchor bolts, and verification of existing anchor bolts.
- EFINOR ENGINEERING IDFHead of Engineering Hub (Stress Analysis)MECHANICAL ENGINEERINGOctober 2018 - December 2022 (4 years and 3 months)Marseille, France
- CNIM Division EnvironnementReferent Stress EngineerENVIRONMENTALFebruary 2017 - September 2018 (1 year and 8 months)La Seyne-sur-Mer, France- Management of the piping part of projects.- Flexibility analysis of waste recovery plants.- Design and verification of supports.- Analysis of turbine ducts using the finite element method (Ø3500mm).- Support study, optimization of support layout and their functions in collaboration with general installation teams.- Modification of piping layouts according to calculations and engineer's advice.• Earl’s Gate Project (Scotland): Steam export flexibility analysis (from boilers to client flanges), improvement of network design (DN450 and DN200), definition of supports, calculation of load transfers for rack calculation. Rack calculation. (EN13480, Eurocode)• Sharjah Project (United Arab Emirates): Turbine exhaust duct analysis (Ø3720mm), wind and seismic load analysis (1.1g (x;y); 1.08g (z)).Stress validation, support types, and load transfers.(ASME, ADIBC, ASCE 7)• Belgrade Project (Serbia): Turbine exhaust duct analysis (Ø3324mm), wind, snow, and seismic load analysis (0.36g (x;y)).Stress validation, definition of support types, and calculation of load transfers for GC.(EN13480, Eurocodes)• ADFER Park Project (United Kingdom): Project calculation referent, responsible for piping networks to be calculated (superheated steam, condensate, feedwater, turbine exhaust duct).Flexibility analysis, support calculation/verification (point for mechanical resistance verification), drafting/verification of calculation notes. Modification/validation of piping routings according to calculations and environmental constraints.Nozzle, flange analysis, preliminary calculation of certain ESPs to obtain allowable limits for nozzles.Contact with subcontractors, verification/validation of subcontracted calculations (Turbine Duct, supports, structures).Verification/validation of specifications for certain equipment.Introduction to Process.(EN13480, Eurocodes)• THIVERVAL Project (France): In collaboration with the pipefitter on the Saint Aubin site (site surveys and photos), design of a routing from the turbine to the air coolers, definition of supports.Structure calculation to obtain load transfers. (EN13480, Eurocodes (wind))• KEMSLEY Project (United Kingdom): Flexibility analysis of 2 piping lines attached to the boiler (saturated steam and superheated steam). (EN13480, Eurocodes) - Responsible for verifying technical specifications, calculation notes, and other subcontractor documents
Recommendations
Be the first to recommend Mickael
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4