About Markus
German
Native or bilingual
English
Fluent
Experience
- Heinzle ConsultingEntrepreneur ConsultantDecember 2021 - Today (4 years and 6 months)• Conducted 3 projects for clients in the food industry• Integration of Operation Management System / Implementation of OEE and KPI-oriented work / Integration of Top-Down and Bottom-Up communication / Cost reduction /• Brandenburg €4.2 million / Mecklenburg €1.3 million / Saxony €0.9 million The goal was to break up usual working methods. Employees should be promoted in their communication and problem-solving skills. In addition to achieving savings, it was important to integrate a system that ensures a continuous and standardized communication process from the production of each individual plant up to the corporate headquarters.
- GETZNER WERKSTOFFETeam Leader / Overall Responsibility for Lean ProgramSeptember 2020 - November 2021 (1 year and 2 months)Bürs, VO, Austria• Management and further development of two production areas (4 direct / 60 total)• Compensating for personnel shortages by increasing productivity through efficiency gains• Leading cross-functional problem-solving projects with Black Belt level complexity The challenge was to ensure efficient production. Large call-off fluctuations, massive raw material shortages, and a lack of problem-solving skills were constant companions. With the integration of effective shop floor management, shop floor leaders were able to take over the management of their areas. Based on needs, employees were guided towards an active role in problem-solving using Lean and Six Sigma methods.
- ThyssenKrupp Presta AGPlant CoordinatorNovember 2019 - August 2020 (9 months)Florida, USA• Coordination of global business process management measures / Top down & Bottom-up• Project coordination for the relocation of 50% of the machining area to Poland / Time and budget on target• Securing global supply commitments during the SARS-CoV-2 pandemic The project management for cost-saving measures (e.g., relocation of a production area) included time management, pre-production, cross-plant coordination, budget adherence, customer coordination, and finally the re-commissioning (PPAP) of processes. To eliminate production bottlenecks, I was also deployed in other global production plants. At the beginning of the pandemic, the focus was on coordinating the global supply chain to ensure customer supply. To secure liquidity, I coordinated personnel requirements based on raw material availability and organized short-time work for the authorities.
Recommendations
Be the first to recommend Markus
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Education
- Apprenticeship as a CarpenterTischlerei Abbrederis Walter1995Tischler Lehre
- Master CraftsmanHTL Imst Meisterschule2001Meister