You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Lennard ArmlichLA

Lennard Armlich

Energy Data Analyst | Power Systems, Electricity M

€480/day
Zürich, CH
0-2 years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Lennard

Energy Data Analyst with a focus on electricity markets, energy systems, and data-driven decision-making.

I support companies in the energy sector in analyzing complex energy data, analyzing market mechanisms, and quantitatively answering technical or economic questions. My focus is on electricity market data, grid integration of renewable energies, charging infrastructure, and energy system analyses.

Through my experience with grid operators, energy companies, and engineering firms, I am familiar with both the technical and market aspects of modern energy systems. I regularly work with large datasets from electricity market and grid contexts and develop analysis and visualization tools to support planning, decision-making, and reporting.

Typical projects include:

Analysis of electricity market data and price time series
Power BI Dashboards for energy data and market analyses
Python-based evaluation of load profiles and energy system data
Feasibility studies for PV or charging infrastructure projects
Data-driven decision support for energy projects

Tools and technologies:

Python
Power BI
QGIS
MATLAB / Simulink
Excel / VBA

I work in a structured, data-driven manner with a clear focus on actionable results. The goal of my analyses is to make complex relationships understandable and to provide well-founded decision-making bases.
  • German

    Native or bilingual

  • English

    Fluent

Can work on-site
Zürich (up to 50km)

Experience

  • ewz
    Product Development Renewable Energies
    ENERGY AND UTILITIES
    March 2026 - Today (3 months)
    Zürich, Switzerland
    - Flexibilities and e-mobility
    - Product development energy products
    - Energy transition
    - Electricity trading
    Energy Economics Renewable Energies E-Mobility
  • Gruner
    Energy Project Development
    March 2025 - March 2026 (1 year)
    Zürich, Switzerland
    GIS-based preliminary planning of storage sites and
    Determination of catchment areas, lake and dam volumes,
    Elevation curves, dam concrete volumes, and determination of
    Wave heights and dam parameters according to USBR standards

    MATLAB tools for the analysis of residual water flows (pressure tunnels, storage concepts, management) determined

    VBA tools for automating hydraulic calculations built Offer and submission preparation (SIA phases 11 – 52) supported
    International project work Location Manila, Philippines
  • Bosch Electric Mobility
    Energy Project Development
    ENERGY AND UTILITIES
    May 2024 - October 2024 (5 months)
    Reutlingen, BW, Germany
    Support with testing and development of the charging/converter system for electric vehicles

    Participation in validation, test planning, and measurement data evaluation

    Fault diagnosis and optimization of charging electronics

Recommendations

Be the first to recommend Lennard

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Master of Science
    ZHAW School of Engineering
    2027
    Master of Science
  • Bachelor of Science
    HOCHSCHULE FÜR FORSTWIRTSCHAFT ROTTENBURG
    2025
    Bachelor of Science

Skill set

Categories