About Kai
German
Native or bilingual
English
Conversational
Experience
- KWPE-Prozess Ablauf MenschOwnerCONSULTING AND AUDITSMarch 2021 - Today (5 years and 5 months)Kitzbühel, AustriaProcess Flow HumanShort-term projects in operational areas - approx. 2-12 weeks + Production improvements + Logistics improvements + Improvements in indirect areas - Work preparation, production control, assembly planning.The goal of optimization is cost savings, the goal of change is the peak.Let's lead your SME to the top togetherKWPE - Together to the summit
- InnoPark Suisse SAProject ManagementMay 2020 - November 2020 (6 months)Zürich, SwitzerlandTesting of various project management systems, such as Asana, Monday, Factro, and others for decision-making purposes
- Diverse FirmenManufacturing EngineerMay 2014 - December 2019 (5 years and 7 months)SwitzerlandDay-to-day business + General work in the ERP system + Troubleshooting + Interface maintenance change/lean + Analyzing + optimizing assembly workstations + Ergonomic assembly aids to reduce strain + Implementation + Support of on-site support + Introduction + Setup of shop floor management + Setup + further development of a meaningful key performance indicator system + Actively driving the CIP process + Addressing deviations + Increasing quality Planning assembly + Planning an assembly line for a sister plant in China + Introduction of line production + Elaboration + coordination of concepts + Planning of new + existing pre-assembly workstations + Consideration + examination of batch sizes with high variety + high setup effort + Consideration of batch size 1 in tower assembly Material flow planning + Production logistics + Elaboration + optimization of logistics concepts + Introduction of Kanban with external manufacturers - adjustment of drawings + documentation + Setup workstations for electrical production - Milkrun + Introduction of material control on a daily basis + Introduction of pick-by-light Project work + Management + order + cleanliness implementation + Deputy Manager Final Assembly + Leading optimization projects - Setup of new processes incl. documentation + Planning + execution of Kaizen workshops + Training of employees Work study + Creation + review of MTM analyses – SD, UAS, MEK, C-values + Takt times for assembly lines with planning tools + Fault analysis in the plant in Turkey + Review of time standards according to REFA + Takt time of the line incl. material control at the line for short-cycle orders Documentation + Creation + revision of assembly + material layouts with other departments + Creation of self-explanatory assembly instructions including training + Participation in FMEAs
Recommendations
Be the first to recommend Kai
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Education
- Master of Business Administration - MBA, MBA Organisationsentwicklung & BeraterIKF Luzern2024Master of Business Administration - MBA, MBA Organisationsentwicklung & Berater
- Technischer Betriebswirt IHK, Technische BetriebswirtschaftDAA Technikum2008Technischer Betriebswirt IHK, Technische Betriebswirtschaft