You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Issa OuattaraIO

Issa Ouattara

Methods and Cost Estimation Engineer

€715/day
Paris, FR
8-15 years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Issa

Freelance cost estimation and methods engineer, I support construction companies in their bid responses and project preparation.
I act as an immediately operational reinforcement, with an approach focused on economic performance, technical feasibility, and deadline compliance.

What I offer is:
"Immediately operational cost estimation & methods support"

"More bids processed, without hiring"

"Secure your prices and methods on your construction projects"
  • French

    Native or bilingual

  • English

    Conversational

Can work on-site
Paris (up to 50km)

Experience

  • RAZEL –
    METHODS ENGINEER
    January 2017 - September 2018 (1 year and 8 months)
    Project Description: Construction of an approximately 800m interchange to alleviate traffic congestion at the SOLIBRA intersection.
    • Preparation of site installation plans
    • Site installation quantity surveying
    • Development of the construction phasing plan for the bridge using the incremental launching method
    • Supervision of drafters during the preparation of execution plans (reinforcement, formwork)
    • Structural calculations and methods plans for temporary works, skills=[]
  • EIFFAGE INFRASTRUCTURES – PROJETS INTERNATIONAUX
    COST ESTIMATION ENGINEERING INTERNSHIP
    July 2019 - December 2019 (5 months)
    PROJECT 1: Design and execution of road projects (110 km) and a 110m bridge in Guinea. Project 2: In collaboration with the methods department, we were responsible for:
    • Proposing solutions
    • Coordinating methods studies
    • Preparing site installation plans
    • Performing quantity take-offs
    • Assembling detailed cost breakdowns
    • Creating the equipment schedule
    • Developing the work execution schedule
    • Phasing the bridge construction using the launching method
    • Equipment sizing
    • Calculating direct costs
    • Calculating site overheads
    • Calculating the selling price
    • Finalizing the bid
    • Writing technical notes, skills=[]
  • VINCI-CONSTRUCTION France
    METHODS ENGINEER
    January 2020 - June 2020 (5 months)
    Arbonis, Verosvres, France
    • Performing quantity take-offs
    • Conducting cycle studies and selecting lifting and temporary stabilization equipment
    • Proposing operational methods for the construction of the timber frame structure (columns – beams – CLT floor – Timber frame wall)
    • Calculating temporary works, skills=[]

Recommendations

Be the first to recommend Issa

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Specialized Master's in Construction Methods and Cost Estimation
    CENTRES DES HAUTES ÉTUDES DE LA CONSTRUCTION (CHEC)
    2019
    Mastère spécialisé en Méthodes d'exécution des ouvrages et Études de prix
  • Civil Engineering Degree in Public Works
    INSTITUT NATIONAL POLYTECHNIQUE HOUPHOUËT BOIGNY (INPHB)
    2016
    Cycle Ingénieur des travaux Publics

Skill set

Categories

  • Other