You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Henry España SerranoHE

Henry España Serrano

Electrical Facilities Engineer

€250/day
Madrid, ES
8-15 years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Henry

For the Construction Sector, the following documents are prepared:
  • Preparation of Work Execution Report.
  • Preparation and Review of Safe Work Procedure (SWP).
  • Preparation of Job Hazard Analysis (JHA)
  • Work Planning with Plan vs. Actual progress curves.
For the Engineering Sector, the following documents are prepared:
  • Preparation of Metric Computations, Analysis and Payment Method, Materials List, and Construction Specifications.
  • Design and review of Electrical plans.
  • Design and Calculations of Cathodic Protection Systems for Pipelines and Tanks
For the Operations and Maintenance Sector:
  • Preparation of Operations and Maintenance Report.
  • Preparation and Review of Gas Pipeline Station and Branch Reports.
  • Preparation of Procedure Lists.
  • Preparation of Operational and Maintenance Procedures.

For the Quality Sector

  • Preparation of Quality Plans.
  • Preparation of Quality Forms
  • Preparation of Work Inspection and Testing Plan
  • Preparation of Checklists
  • Spanish

    Native or bilingual

  • English

    Conversational

Remote only
Primarily works remotely

Experience

  • PDVSA GAS.
    Distribution Operations Supervisor
    January 2020 - November 2025 (5 years and 10 months)
    Anaco, AN, Venezuela
    For the past 5 years, I have led the work team, overseeing the operational control and administrative management of the Distribution Department, which monitors, supervises, and maintains the Methane Gas Distribution networks for clients in the Petrochemical, Electrical, Industrial, Domestic, and Automotive sectors in the Eastern zone of Venezuela, recovering 16 stations that were out of service.
  • PDVSA GAS
    Senior Operations Technician
    April 2019 - January 2020 (9 months)
    Anaco, AN, Venezuela
    For 1 year, I performed Station Inspections, customer consumption readings, preventive and corrective maintenance, carrying out a zero-based inventory of the entire Distribution department.
  • PDVSA GAS.
    Electrical Works Inspector and Electrical Projects Engineer.
    December 2011 - April 2019 (7 years and 4 months)
    Barcelona, AN, Venezuela
    Project: Civil, Electrical, Mechanical, and Instrumentation Works. I led the work team as an electrical works inspector for 5 years on the following Projects: -Civil, Electrical, Mechanical, and Instrumentation Works for the Soto Norte Electrical Substation. -Implementation of the Methane Gas Supply System for the Electrical Substation - Implementation of the 69 KV Electrical Transmission Line for the Soto Deep Extraction Plant - Construction of the Soto Norte Electrical Substation of 13.8 KV / 69 KV, culminating in the commissioning of the Soto Norte Generation Center transmitting 45 MW ISO. Additionally, I performed Quality Inspector functions for the Electrical and Instrumentation disciplines and as a Storekeeper. Business: Engineering Management During contracting, and Electrical Designer.

Recommendations

Be the first to recommend Henry

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Electrical
    Universidad de Oriente
    2009
    Eléctrica
  • Evaluation of Hazardous Atmospheres, Confined Spaces, and Work Permit Systems CEFOGAS
    NORTE,ANACO
    2025
    Evaluación de Atmósferas Peligrosas, Espacios Confinados y Sistemas de Permisos de Trabajo CEFOGAS

Skill set

Categories