- Preparation of Work Execution Report.
- Preparation and Review of Safe Work Procedure (SWP).
- Preparation of Job Hazard Analysis (JHA)
- Work Planning with Plan vs. Actual progress curves.
- Preparation of Metric Computations, Analysis and Payment Method, Materials List, and Construction Specifications.
- Design and review of Electrical plans.
- Design and Calculations of Cathodic Protection Systems for Pipelines and Tanks
- Preparation of Operations and Maintenance Report.
- Preparation and Review of Gas Pipeline Station and Branch Reports.
- Preparation of Procedure Lists.
- Preparation of Operational and Maintenance Procedures.
- Preparation of Quality Plans.
- Preparation of Quality Forms
- Preparation of Work Inspection and Testing Plan
- Preparation of Checklists
Spanish
Native or bilingual
English
Conversational
Experience
- PDVSA GAS.Distribution Operations SupervisorJanuary 2020 - November 2025 (5 years and 10 months)Anaco, AN, VenezuelaFor the past 5 years, I have led the work team, overseeing the operational control and administrative management of the Distribution Department, which monitors, supervises, and maintains the Methane Gas Distribution networks for clients in the Petrochemical, Electrical, Industrial, Domestic, and Automotive sectors in the Eastern zone of Venezuela, recovering 16 stations that were out of service.
- PDVSA GASSenior Operations TechnicianApril 2019 - January 2020 (9 months)Anaco, AN, VenezuelaFor 1 year, I performed Station Inspections, customer consumption readings, preventive and corrective maintenance, carrying out a zero-based inventory of the entire Distribution department.
- PDVSA GAS.Electrical Works Inspector and Electrical Projects Engineer.December 2011 - April 2019 (7 years and 4 months)Barcelona, AN, VenezuelaProject: Civil, Electrical, Mechanical, and Instrumentation Works. I led the work team as an electrical works inspector for 5 years on the following Projects: -Civil, Electrical, Mechanical, and Instrumentation Works for the Soto Norte Electrical Substation. -Implementation of the Methane Gas Supply System for the Electrical Substation - Implementation of the 69 KV Electrical Transmission Line for the Soto Deep Extraction Plant - Construction of the Soto Norte Electrical Substation of 13.8 KV / 69 KV, culminating in the commissioning of the Soto Norte Generation Center transmitting 45 MW ISO. Additionally, I performed Quality Inspector functions for the Electrical and Instrumentation disciplines and as a Storekeeper. Business: Engineering Management During contracting, and Electrical Designer.
Recommendations
Be the first to recommend Henry
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Education
- ElectricalUniversidad de Oriente2009Eléctrica
- Evaluation of Hazardous Atmospheres, Confined Spaces, and Work Permit Systems CEFOGASNORTE,ANACO2025Evaluación de Atmósferas Peligrosas, Espacios Confinados y Sistemas de Permisos de Trabajo CEFOGAS