You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Harry SpeerHS

Harry Speer

Operational & Logistics Coordinator — Vehicle Transportation

€350/day
Thonon-les-Bains, FR
15+ years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Harry

Independent operational coordinator based in Haute-Savoie, I am involved in field coordination, logistics management, and vehicle transportation missions in France and Switzerland.

Alpine Coordination acts as a reliable interface between the field, teams, and decision-makers.

I am particularly involved in:

• Project and stakeholder coordination
• Logistics flow supervision and organization
• Secure vehicle transportation (France / Switzerland)
• On-site operational support
• Managing unforeseen events in constrained environments

Area of operation: Haute-Savoie, Geneva, Lausanne, Neuchâtel, Lyon, and Alpine and border routes.

Methodical, rigorous, discreet, and responsive.


Pricing adapted according to the type of mission (fixed fee for transportation possible).
  • French

    Native or bilingual

  • English

    Conversational

Can work on-site
Thonon-les-Bains (up to 50km)

Experience

  • Alpine Coordination
    Independent Operational Coordinator
    January 2024 - Today (2 years and 5 months)
    • Operational coordination and administrative assistance for professionals and the self-employed
    • Organization of daily activities and operational monitoring
    • Coordination of vendors and external contacts
    • Structuring of processes and streamlining of administrative follow-up
    • Client relationship management and request tracking
  • Griesser
    Project Monitoring for Solar Shading Study and Installation
    September 2024 - November 2025 (1 year and 2 months)
    As part of the installation of motorized solar shading systems, my role was not limited to the installation itself.
    I was involved upstream to study the technical feasibility of the project, taking into account the site and existing environmental constraints.

    This analysis included in particular:
    • assessing the placement of the shading system and solar exposure,
    • checking the supports (facade, structure, fixing),
    • analyzing electrical constraints (power supply, cable routing, safety),
    • ensuring compliance with current standards through my electrical qualification HEBE.

    This study phase allowed us to validate or invalidate the feasibility, anticipate necessary adjustments, and guarantee a reliable, safe, and durable installation.
    When the project was validated, I then ensured coordination and implementation with a focus on quality, safety, and performance.
  • SAEM SPORTS ET TOURISME
    Driver and Operations
    March 2020 - September 2024 (4 years and 6 months)
    The disengageable driver ensures the proper functioning of the installation in compliance with current regulations, manages customer relations, and handles unforeseen events and accident situations.
    Turn off the installation if there is a risk of a storm.
    Maintenance / handling of RM
    Vehicle and personnel transfer

Recommendations

Be the first to recommend Harry

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Skill set

Categories