Technical and architectural synthesis

Spatial management of networks for various trades in false ceilings, raised floors, including detection and resolution of conflicts between HVAC networks, with cutting plans per level

Management of HVAC reservation requests and dissemination to the structural engineering department for consideration

Spatial management of networks for various trades in technical shafts

Creation of necessary sections

Terminal synthesis (excluding vertical elements)
  • French

    Native or bilingual

Can work on-site
Paris (up to 50km)

Experience

  • BET CAPEC
    Thermal Equipment Technician
    CIVIL ENGINEERING
    January 1996 - January 2001 (5 years)
    Cachan, France
    1. Preparatory analysis and data integration
    • Document collection: Centralization and critical analysis of all execution plans (DWG/PDF files) provided by the design office and various subcontractors.
    • Consistency verification: Checking the compliance of subcontractor execution plans against the architect's guide plans and the structural engineering department's constraints.
    2. Network overlay and conflict detection
    • Geometric overlay: Rigorous computer-aided overlay of plans for all technical trades (HVAC, Smoke Extraction, Plumbing, Electrical - High/Low Voltage).
    • Anomaly identification: Systematic detection of physical collisions (e.g., a ventilation duct crossing a concrete beam or a cable tray) and inconsistencies in routing.
    • Space optimization: Detailed study of clearances in critical areas (false ceiling plenums, vertical technical shafts, technical rooms).
    3. Coordination and facilitation of the synthesis cell
    • Synthesis meetings: Organization and facilitation of periodic coordination meetings with all site managers and company engineering departments.
    • Dispute resolution: Proposing routing alternatives and geometric arbitration to find the best compromise between space/cost/performance.

    • Technical synthesis plans: Issuance of general synthesis plans (in DWG and PDF format) integrating all validated and coordinated networks.
    • Sections and principle details: Creation of specific detail sections for high-density areas (boiler rooms, substations, complex plenum intersections).
    • Reservation plans: Establishment and validation of definitive reservation plans (openings, core drilling, service penetrations) required before concrete pouring or partition installation.
    Autocad Synthesis Design drafter Plumbing HVAC
  • ZURICH ASSURANCES (Immeuble d'habitation)
    Quotation and Execution Plan for HVAC
    April 1997 - April 1997
    1. Preparatory analysis and data integration
    • Document collection: Centralization and critical analysis of all execution plans (DWG/PDF files) provided by the design office and various subcontractors.
    • Consistency verification: Checking the compliance of subcontractor execution plans against the architect's guide plans and the structural engineering department's constraints.
    2. Network overlay and conflict detection
    • Geometric overlay: Rigorous computer-aided overlay of plans for all technical trades (HVAC, Smoke Extraction, Plumbing, Electrical - High/Low Voltage).
    • Anomaly identification: Systematic detection of physical collisions (e.g., a ventilation duct crossing a concrete beam or a cable tray) and inconsistencies in routing.
    • Space optimization: Detailed study of clearances in critical areas (false ceiling plenums, vertical technical shafts, technical rooms).
    3. Coordination and facilitation of the synthesis cell
    • Synthesis meetings: Organization and facilitation of periodic coordination meetings with all site managers and company engineering departments.
    • Dispute resolution: Proposing routing alternatives and geometric arbitration to find the best compromise between space/cost/performance.

    • Technical synthesis plans: Issuance of general synthesis plans (in DWG and PDF format) integrating all validated and coordinated networks.
    • Sections and principle details: Creation of specific detail sections for high-density areas (boiler rooms, substations, complex plenum intersections).
    • Reservation plans: Establishment and validation of definitive reservation plans (openings, core drilling, service penetrations) required before concrete pouring or partition installation.
    Autocad Analytical and synthesis skills Design drafter HVAC Plumbing
  • MECCA 19 (Oger)
    MECCA 19 (Oger)
    CIVIL ENGINEERING
    January 2001 - January 2001
    Paris 17, France
    1. Preparatory analysis and data integration
    • Document collection: Centralization and critical analysis of all execution plans (DWG/PDF files) provided by the design office and various subcontractors.
    • Consistency verification: Checking the compliance of subcontractor execution plans against the architect's guide plans and the structural engineering department's constraints.
    2. Network overlay and conflict detection
    • Geometric overlay: Rigorous computer-aided overlay of plans for all technical trades (HVAC, Smoke Extraction, Plumbing, Electrical - High/Low Voltage).
    • Anomaly identification: Systematic detection of physical collisions (e.g., a ventilation duct crossing a concrete beam or a cable tray) and inconsistencies in routing.
    • Space optimization: Detailed study of clearances in critical areas (false ceiling plenums, vertical technical shafts, technical rooms).
    3. Coordination and facilitation of the synthesis cell
    • Synthesis meetings: Organization and facilitation of periodic coordination meetings with all site managers and company engineering departments.
    • Dispute resolution: Proposing routing alternatives and geometric arbitration to find the best compromise between space/cost/performance.

    • Technical synthesis plans: Issuance of general synthesis plans (in DWG and PDF format) integrating all validated and coordinated networks.
    • Sections and principle details: Creation of specific detail sections for high-density areas (boiler rooms, substations, complex plenum intersections).
    • Reservation plans: Establishment and validation of definitive reservation plans (openings, core drilling, service penetrations) required before concrete pouring or partition installation.
    Autocad Analytical and synthesis skills HVAC Plumbing Design drafter

Recommendations

Be the first to recommend Frederic

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • 2-year apprenticeship program and diploma in Technical Equipment Energy Technician
    LTEP Maximilien Perret – GEFEN Vincennes (94)
    1998
    Formation de 2 ans en contrat d'alternance et diplôme de Technicien Equipement Technique Energie
  • STI Engineering in Energy - Final Year
    LTEP Maximilien Perret
    1996
    Terminale STI Génie Energétique