You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Florian CoignetFC

Florian Coignet

Bim Manager

€450/day
3 projects
Paris, FR
3-7 years

Average response time: 2 hours

Freelancer profile translated to English.
Back to original language

About Florian

I started my career as a BIM Designer before becoming BIM Manager at Engie Solutions. I had the opportunity to work on a wide variety of BIM projects, covering all phases of a building's life cycle (from design to construction, including operation-maintenance and renovation) and with a strong technical specialization in HVAC, plumbing, and electricity.

With 8 years of experience, I now offer my expertise to you, providing skills covering a wide range of BIM issues:
  • Revit Designer (Architecture, HVAC, Plumbing, Electricity) and family creation
  • Revit modeling trainer
  • BIM Management (technical and architectural coordination, definition of BIM processes, model audit, etc.): Navisworks, Solibri Model Checker
  • Implementation of the Common Data Environment: Autodesk BIM 360, Kroqui, others
  • BIM 4D, 5D
  • Creation of the digital twin (DOE, operation-maintenance digital model)
  • Management of asset and technical data: Business Intelligence (Power BI)
  • Support for BIM transition
  • BIM consulting
  • Etc.
  • French

    Native or bilingual

Can work on-site
Paris (up to 20km)

Experience

  • Freelance
    BIM Manager / BIM Designer (Architecture, HVAC, Plumbing, Electricity) / Revit Trainer
    CIVIL ENGINEERING
    September 2018 - Today (7 years and 11 months)
    Paris, France
    HERE IS A NON-EXHAUSTIVE LIST OF PROJECTS COMPLETED

    Revit modeling in the execution phase for HVAC, Plumbing, Electricity (equipment + networks) of a tertiary building - Bouygues
    • Modeling of heating substation technical networks
    • Creation of Revit object families for plumbing equipment
    • Modeling of cable trays
    • Installation of electrical terminals
    • Creation and data entry for electrical circuits
    • Integration of operation-maintenance DOE data
    • IFC export
    Modeling of Engie campus's underground technical networks in the execution phase - Engie
    • Modeling of ducts, pipes, sewers, gutters, etc.
    • Data entry for operation-maintenance DOE
    • Revit modeling in the execution phase for electrical (low voltage and strong current) networks of the Maison Blanche metro station as part of the extension of line 14 - Industrelec Maison Blanche, Paris
    • Modeling of cable trays, ducts, electrical terminals, control equipment, lighting, etc.
    • Creation of electrical object families (connection panel, control panel, lighting fixtures, etc.)
    • Creation and export of electrical network identification plans
    • Data entry for operation-maintenance DOE.
    TQC compliance of digital DOE models for operation/maintenance use of the REIMS ARENA - Bouygues - Reims
    • Room naming
    • Entry of CMMS codes for equipment
    • Definition of IFC classes for equipment
    • Model cleanup (links, views, families, etc.)
    Trainer in MEP modeling (HVAC + Plumbing) on Revit for a fluid engineering design office, BE Thermique WEST
    • Preparation of training materials based on client needs
    • Post-training support for the engineering office.
    Trainer in architectural modeling on Revit, Ecole Française du digital
    3D Modeling Autodesk Revit Revit Autocad Navisworks Solibry Model Checker BIM Modeling BIM Management BIM Coordination BIM Coordinator BIM Modeler BIM360 BIM Consulting Building Information Modeling (BIM) Electricity HVAC Plumbing
  • ENGIE Solutions France
    BIM Manager/BIM Designer
    CIVIL ENGINEERING
    December 2017 - December 2020 (3 years)
    Paris, France
    HERE IS A NON-EXHAUSTIVE LIST OF PROJECTS COMPLETED

    Support for BIM transition at Brussels Airport. BIM consulting services for Brussels Airport Company - Zaventem, Belgium.
    • Client needs assessment
    • Drafting of BIM documents (BIM charter, BIM agreement, BIM specifications)
    • Definition and implementation of internal business BIM processes
    • Implementation of the collaborative platform BIM 360
    • Selection of contractors.
    Design/modeling project for MEP networks of the HAREN prison during the execution design phase - Engie Benelux, Haren, Belgium.
    • Management of the BIM design team
    • Modeling of HVAC and Plumbing networks
    • Technical coordination
    • Monitoring/verification of modeling according to BIM specifications
    • Production of HVAC and Plumbing execution plans.
    Creation of a 4D construction simulation for the extension of metro line 4 - Spie Batignolles, Bagneux
    This simulation aims to reveal phasing and dimensioning discrepancies between design and execution for the support structure. This video helps justify planning and budget issues to the client (RATP).
    • Creation of 4D construction simulations (design vs. works) on 3ds Max
    • Creation of a communication video for the client (RATP) on Adobe Premier Pro.
    Project for the creation of a digital twin of a building for operation/maintenance use - Yncrea, Lille
    • 3D modeling of the digital twin (ARC/STR/MEP)
    • Creation and population of the digital database
    • Integration of technical operation/maintenance information from the DOE (technical sheet/reference code/maintenance plan) into the digital database
    • Integration of 3D models into a 3D hypervisor/Teia
    • Creation of the data management dashboard/PowerBi.
    3D Modeling Project Management Autodesk Revit Navisworks 3dsmax Microsoft Power BI Solibry Model Checker Electricity HVAC Plumbing
  • Decode BIM
    BIM Coordinator
    July 2017 - December 2017 (5 months)
    Paris, France
    SCAN TO BIM – CHATEAU DES APPRENTIS D'AUTEUIL – MEUDON
    - Existing building modeling from point cloud (ARC, STR, MEP)
    - Extraction and formatting of asset data
    - 15,000 m² / LOD 350 BIM PROMOTION – HARMONIUM
    - 3D modeling (ARC,STR,Roads and Utilities) during preliminary phase
    - Completion of the breakdown of global and fixed prices
    - Creation of sales materials (rendered pictures/virtual reality 3D model) BIM CONCOURS – EUROPACITY / HOTEL LUXURY
    - Architectural project competition, 3D Modeling (ARC)
    - 25,000 m² / LOD 350

Reviews

5.0

Out of 1 rating

H

Hakim

EOLIANCE

Reviewed on 4/24/2024

Quality work and support.

Recommendations

Be the first to recommend Florian

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • CAP in Fashion Trades, Tailoring, Fashion / Clothing Design
    Institut Français de la Mode
    2023
    CAP Métiers de la mode, vêtement tailleur, Mode / conception de vêtements
  • Master 2 (M2), Positive Energy Building
    IMT Mines Albi
    2016
    Master 2 (M2), Bâtiment à énergie positive

Skill set (25)

Categories