You're seeing this page as if you were . The main menu is still yours, though. Exit from immersion
Cristian PerroneCP

Cristian Perrone

Freelance Civil Engineer - Remote First

€750/day
Solingen, DE
8-15 years

Average response time: 1 hour

Freelancer profile translated to English.
Back to original language

About Cristian

Freelance – Construction Project Management – specialized in infrastructure projects (Remote-first)
With 10 years of experience in construction supervision, construction management, and project management, I support clients, planning offices, and construction companies in the field of infrastructure and civil engineering. In my previous roles at Schüßler-Plan, IGS-Ingenieure, and the City of Haan, I have built broad technical expertise – from supervising complex infrastructure measures and coordinating plans and permits to interface management.
Particularly formative projects include the Herne-Baukau Tunnel (BAB A 43), the replacement construction of the Emscher Bridge, the Liedbachtal Bridge (BAB A 1), and the project portfolio on the A 33 and A 44. Here, I have successfully supported methods such as incremental launching, SPMT assembly, steel composite structures, and special civil engineering.

I possess profound knowledge of VOB/B, ZTV-ING, DIN standards, technical regulations, construction process coordination, and public tenders. Additionally, I bring specific experience in dealing with Deutsche Bahn (including participation in BETRA and SiPo coordination meetings).
Remote Work Style
I fundamentally work completely remotely.
Quarterly on-site presence can be arranged if required.
Selected Projects
• Renovation of the Müngsten Bridge, Solingen
• Overpasses and green bridge – new construction A 33
• Road and sewer construction – City of Haan
• Tunnel construction in open-cut method, Herne-Baukau (AK A 43/A 42)
• Cycle/pedestrian path bridge over the Emscher, Castrop-Rauxel
• Replacement construction Emscher Bridge A 43, Liedbachtal Bridge A 1,
• New construction Angerbachtal Bridge A 44, rainwater retention basin & light liquid separator
  • German

    Native or bilingual

  • Italian

    Native or bilingual

  • English

    Basic

Remote only
Primarily works remotely

Experience

  • Schüßler-Plan
    Construction Supervision, Construction Management
    CIVIL ENGINEERING
    October 2020 - Today (5 years and 10 months)
    Dusseldorf, NW, Germany
    • Tunnel construction in Herne-Baukau AK A 43 – A 42 (open-cut method and pipe jacking)
    • Cycle/pedestrian path bridge over the Emscher in Castrop-Rauxel
    • Replacement construction EBZ A 43 in Recklinghausen (SPMT and incremental launching methods)
    • Replacement construction A 1 Liedbachtal Bridge in Unna (incremental launching method)

    In addition to the construction of bridges and tunnels, my activities also include the construction and execution of various shoring types, rainwater treatment plants (RWBA), bored pile walls, and other complex civil engineering structures.
    Construction Management Construction Supervision Project Management Consulting Project Manager Qualification
  • Stadt Haan
    Planning and Project Management of Roads and Sewers
    CIVIL ENGINEERING
    January 2019 - September 2020 (1 year and 8 months)
    Haan, Germany
    Project Manager in municipal civil engineering and road construction
    Responsibility for the development of roads and sewer systems in inner-city areas
    Coordination and consultation with planning offices, construction supervision authority, traffic authority, surveyors, executing construction companies, as well as organization and management of public information events
    Technical support for the renovation of drainage pipes using the in-line method
    Implementation of individual projects, including:
    New construction of a crossing aid
    Complete renovation of a municipal road including renewal of drainage and utility lines
    Project Management Construction Management Leading Site Meetings
  • IGS INGENIEURE GmbH & Co. KG
    Construction Supervision
    CIVIL ENGINEERING
    May 2016 - December 2018 (2 years and 7 months)
    Germany, CV, Philippines
    Selection of relevant projects:

    Renovation of the Müngsten Bridge in Solingen – maintenance of Germany's highest railway viaduct

    New construction of the A 33 near Halle/Westfalen – construction of several overpasses and a green bridge

    New construction of the Angerbachtal Bridge (A 44) – construction using the incremental launching method

    New construction of rainwater retention basins and light liquid separators – water management infrastructure measures

    Replacement construction of the Düte Bridge (A 1) – bridge construction with complex construction processes within existing structures
    Construction Management Construction Supervision Consulting Project Management Leading Site Meetings

Recommendations

Be the first to recommend Cristian

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Education

  • Master of Engineering
    UNIVPM Italy
    2015

Certifications

  • Remote Pilot certificate of competency A1/A3 and A2 (open category)
    EASA
    2025
  • Junior Project Manager
    SPI Akademie
    2024

Skill set

Categories