About Steve
- inconsistent quoting
- untrusted planning data
- unclear or bloated ERP structures
- workarounds replacing structured workflows
___
- simplifying engineering release workflows
- stabilising planning, inventory control, and supply chain
- establishing or stabilising S&OP
- cleaning up ERP and master data
- redesigning cross-functional handovers
- mapping workflows and removing bottlenecks
- rebuilding KPI and reporting structures
- establishing governance and planning rhythms
___
- workflow stabilisation (4–12 weeks)
- engineering-to-planning interface redesign
- ERP and operational systems diagnostics
- planning and reporting rebuilds
___
English
Native or bilingual
Experience
- RUHRPUMPENSENIOR PLM PRODUCT ENGINEERDecember 2024 - Today (1 year and 6 months)
- Led the restructuring of 3D models, drawings, and ERP BOM hierarchies to simplify configuration and create clearer order execution across engineering, supply chain, and manufacturing
- Rebuilt BOM level architecture in BaaN to improve backward planning reliability, reducing planning errors and reactive expediting
- Clarified component structures and order logic to accelerate configuration and reduce ambiguity in execution
- Designed and implemented a structured PLM governance framework spanning daily execution reviews, constraint escalation, design assurance, KPI tracking, sales integration, supply chain review, and strategic alignment, creating a predictable cross-functional operating rhythm across the product line
- Developed a first-principles cost model to align pricing logic with product structure and improve commercial consistency
- Redesigned pump selection logic to remove over-conservatism and enable more competitive, defensible configurations
- RUHRPUMPENPROJECTS AND ENGINEERING MANAGERAugust 2024 - December 2024 (4 months)
- Designed and implemented a Project Engineering competency framework to standardise capability expectations and clarify development pathways
- Established the structure for an internal Project Engineering “University,” enabling subject-matter champions to create peer-led training and formalise knowledge transfer
- Redesigned the Project Engineering workflow to accelerate engineering release and reduce approval bottlenecks
- Re-aligned document control and delivery flow with contractual milestones, replacing reactive escalation with structured execution.
- RUHRPUMPENOPERATIONS MANAGERJune 2023 - August 2024 (1 year and 2 months)Lancing, United Kingdom
- Led end-to-end operations across production, planning, and logistics for a 27-person team
- Improved planning accuracy and material readiness to reduce disruption and reactive expediting
- Tightened engineering-to-production handovers to minimise delays and rework
- Introduced structured daily control routines to strengthen communication and stabilise execution
- Simplified planning processes to reduce operational noise and increase delivery predictability
Recommendations
Be the first to recommend Steve
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Education
- BScSheffield Hallam University2008BSc
- AVCE EngineeringHolywell High School2005AVCE Engineering