With my experience in industry (TRIOWORLD, MONDELEZ, CEVA SANTE, VIVESCIA, TILIZ, KRAZAN, COOPERL, ARMOR PHARMA, ARMOR PROTEINES), I have been in charge of various industrial projects, including a factory expansion (BTP, Civil Engineering, Tertiary TCE, General Services), infrastructure modifications, a production site transfer, general services management, the improvement of old production lines, and the implementation of new lines or new equipment (specialties), AI cameras, as well as robotization, logistics, and their reception, qualification, and validation.

Today, I can therefore support you in the different phases of your projects:

Pre-project URS
Commissioning
Writing specifications (Process, Utilities, Infrastructure)
Supplier consultation
Monitoring budget development
Taking charge of Production and Maintenance of an Industrial site (Management)

Execution phase:
Site monitoring
Welcoming subcontractors/suppliers/Safety
Commissioning/startup of lines
FAT - SAT - Equipment qualification (QI/QO/QP)
Monitoring invoicing, acceptance of works.

Combining all these skills with my interpersonal qualities, I can leverage them within your company.

I look forward to hearing from you soon.

Sincerely,
SEVAULT Hervé
  • English

    Basic

  • French

    Native or bilingual

Can work on-site
Pontivy (up to 50km), Rennes (up to 50km), Avranches (up to 50km), Nantes (up to 50km), Lorient (up to 50km)

Experience

  • Trioworld
    Industrial Project Manager / Coordinator
    RAW MATERIALS INDUSTRY
    October 2025 - Today (8 months)
    Béré, France
    TRIOWORLD
    Industrial Project Manager, Coordinator.

    Ombré d’Anjou 49420 / Polyethylene extrusion / Plastic material recycling production

    Context:
    Permanent replacement of the project manager.
    Monitoring of schedules, budgets, external companies, from works to commissioning.
    Coordination of the integration of a new sorting production line (12 companies and +30 people)

    My objective
    1. Monitoring of civil engineering works, construction, facade modification, framework + cladding / TCE / dismantling of the old production line / Integration of the new production line / commissioning.
    Budget €2.9M
    2. Study of a new truck loading bay on a ramp for a forklift.
    Budget €150k

    Mission
    Budget management by project
    Management of external companies
    Coordination of works and management of coactivity
    Commissioning and acceptance of works,

    Technical environment
    Polyethylene extrusion / Plastic recycling treatment plant
    Civil Engineering Construction Project Management Technical Project Management Coordinator
  • Mondelez
    Industrial Project Manager
    AGRICULTURE
    July 2024 - July 2025 (1 year and 1 month)
    Nantes, France
    On the LU site of La Haie Fouassière (Nantes)
    Replacement of the project manager during sick leave.
    Monitoring of schedules, budgets, external companies, from works to commissioning, as well as after-sales service.
    Inter-departmental coordination
    My objective
    1. Replacement of 2 Fanuc robots from supervision to automation and robotization, budget €800k
    2. At the end of a production line, integration of a helical conveyor and an overhead conveyor of about 35m converging on the central palletization line. Budget €300k
    3. In a 700 m2 production room, replacement of lighting fixtures. Budget €30k
    Missions
    Capex budget management per project
    Management of external companies
    Monitoring of works and management of coactivity
    Commissioning and acceptance of works.
    Handover to production and maintenance department
    Agri-food, production of sweet and savory biscuits

    Heudebert site in Granville (Normandy)
    Context
    The 7-step project consists of bringing existing equipment (50 years old) up to standard before baking in the oven and potentially replacing it. Review the entire packaging process: portioning, wrapping, cartoning, up to palletization.
    Project €7 million
    My objective
    1. Equipment safety
    .2. Production quality
    .3. Procurement, study, and sourcing of technologies + integrators
    Missions
    Source impacted points on the process and research technologies, integrators, and budget
    Procurement and integration of an AI camera on the process after a slicer for counting 33 loaves of bread before a bread slice placer for integration onto the oven's baking conveyor.
    Study the feasibility of controlling and ejecting non-conforming loaves.
    On the process after slicing, provide a quote for automated line startup and shutdown.
    Begin studying the improvement of the bread resting process after cooking.
    Production of rusks/toasts
    Coordination Project Management Schedule Management Budget Management Robotics
  • ceva
    New Works Manager
    PHARMACEUTICALS INDUSTRY
    January 2024 - June 2024 (6 months)
    Loudéac, France
    Context
    Reorganization of the site's technical structure and harmonization of flows
    Studies of
    new production layouts, workshop modifications
    with utilities. <span style="mso-font-width:
    110%">Process improvement.
    <p class="MsoBodyText" style="margin-top:0cm;line-height:9.05pt;mso-line-height-rule:
    exactly">Missions
    Creation
    of a workshop with all utilities for R&D for the implementation of
    a new filler. Quality control of properly closed cases.
    <p class="MsoBodyText" style="margin-top:0cm;line-height:9.05pt;mso-line-height-rule:
    exactly">Implementation<span style="letter-spacing: .1pt"> of the Pheromones workshop.
    Management of site flows from outgoing Finished Goods stock.
    <span style="font-family:"Arial Black",sans-serif;
    letter-spacing:-.1pt;mso-font-width:95%">Results
    Implementation of an AI camera to control the
    proper closing of cases. Feasibility studies for new
    production workshops with all utilities.
    <p class="MsoBodyText" style="margin-top:0cm;margin-right:105.35pt;margin-bottom:
    0cm;margin-left:1.3pt;margin-bottom:.0001pt;line-height:115%">Preliminary design
    of moving a Pheromones production line<span style="letter-spacing:
    -.3pt"> major line (120M € turnover) from the site to a new workshop. Finalized<span style="letter-spacing:
    -.4pt"> preliminary design for the management of flows for incoming raw materials, packaging materials, finished goods, and personnel<span style="letter-spacing:
    -.4pt"> on site.
    Preliminary Design Site Acceptance Test Factory Acceptance Test IQ Commissioning

Recommendations

Be the first to recommend Hervé

Help this freelancer shine by sharing your experience working together.

These freelancer profiles also match your criteria

AgathaA

Agatha Frydrych

Backend Java Software Engineer

4.7

(3)

2

BaptisteB

Baptiste Duhen

Fullstack developer

4.6

(4)

5

AmedA

Amed Hamou

Senior Lead Developer

4

(2)

7

AudreyA

Audrey Champion

Web developer

4.3

(3)

4

Skill set

Categories

  • Other